Paving a canal in inset application: The mould below the machine frame has been specially manufactured for this project.
Road construction in Spain with the SP 500.
The SP 500 shown here has been retracted to its minimum overall width, enabling it to pave this traffic parapet.
Paving track profiles in a tunnel: The SP 500 shown here is working without a rear right crawler track. Their experience and know-how enabled the Wirtgen engineers to find a feasible solution even for this requirement. The customer is using a wireless levelling control system without stringlines.